Change: Post-Audit Hardening 2026-08-20
2026-08-20 — Lock follow-up goals and task boundaries
- Add
plan_post_audit_hardening_20260820.mdwith the evidence-backed scope, non-goals, acceptance gates, and stop condition for the post-audit defects. - Add
task_post_audit_hardening_20260820.mdwithtask037–task042and the remainingtask030performance gate. - Add issue records for each user-visible or public-contract defect before
implementation, including
issue028for the stale-bytecode evaluator false-green. - Behavior/Risk: documentation-only planning. Closed historical issues
remain closed;
issue018remains open until its locked gate is met.
Verification
- Next task ID is
task037; no task ID is reused. - The plan explicitly separates buffer ownership, live semantics, dictionary lookup, C validation, test gates, integration lifecycle, and performance.
- No production or test source is changed in this planning pass.
2026-08-20 — Implement correctness and gate hardening
- Modify
ekp-buffer.elandtests/ekp-buffer-tests.elfor preflight width validation, backward-delete live stability, and no-projection integration cleanup (task037,task038,task042;issue022,issue023,issue027). - Modify
ekp-hyphen.elandtests/ekp-tests.elfor exact normalized locale lookup (task039,issue024). - Modify
ekp_c/ekp.candtests/ekp-c-tests.elfor sorted, unique, in-range break-position validation in direct and batch APIs (task040,issue025), with the 15-field ABI unchanged. - Modify the showcase, source loader, test runners, Windows CI entry,
and complete ERT selection to remove stale-bytecode false greens and
restore automatic inline-code verification (
task041,issue026). - Modify the live evaluator script/bootstrap to load source from the
selected baseline/candidate root (
task030,issue028). The corrected narrowed matrix still exceeds the source 16 ms target, soissue018andtask030remain open. - Commit:
6a8c7e0.
2026-08-20 — Record source-fresh performance boundary
- Add
postmortem/20260820-source-fresh-live-commit-gate.mdto explain why the stale-bytecode evaluator result was invalid and why the corrected source gate remains an opentask030performance target. - Evidence: width-80/two-row/GC-excluded source candidate p95/p99 are 23.294 ms (C) and 78.593 ms (Elisp), with parity, zero-work, GC, conflict, and non-regression checks true. The high-row full matrix was stopped after a source DP cell exceeded two minutes of CPU; it is not claimed as complete evidence.
- Commit:
60b299bandpostmortemfollow-up commit.
2026-08-20 — Attribute incremental append cost and preserve raw evidence
- Modify
tests/ekp-live-commit-evaluator.elto timeekp-layout-plan-appendandekp--dp-cache-appendseparately in each raw sample and report them beside total/publication timings. - Modify
tests/run-live-commit-evaluator.shto write each run into a unique raw directory and atomically replace the report after comparison. - Evidence: source-fresh width-80/two-row/GC-excluded candidate p95 is 17.161 ms C append / 1.187 ms C append-DP, and 73.293 ms Elisp append / 57.063 ms Elisp append-DP; raw JSONL is nonempty and parity/zero-work/GC/ conflict/non-regression remain true. No production optimization is claimed yet because the measured DP/append owners require an exact redesign.
- Commit:
db6e6b9.
2026-08-20 — Split append preparation, assembly, and DP timings
- Modify the evaluator to time
ekp--append-paraandekp--layout-plan-from-paraindependently, fixing a wrapper-name collision found by the first red run. - Evidence: latest source-fresh candidate p95 is C append/append-DP 16.953/1.015 ms and Elisp append/append-DP 71.896/55.970 ms; both engines spend about 9.753 ms in append preparation and 5.663 ms in plan assembly. The report remains red, raw JSONL is nonempty, and the wrapper itself now passes the same matrix without argument errors.
- Commit:
01001b9.
Verification
- Source-first normal ERT: 295/295.
- Source-first seeded random ERT: 295/295, including all nine GUI verifier tests previously omitted by the name filter.
- Per-test isolated ERT: 294/294 process runs logged
0 unexpected; the later batch-position test is covered by focused isolated C ERT. - C focused ERT: 15/15; C portable build warning-clean; source fuzz: 300/300 with zero failures; checkdoc, release, dictionary, and shell gates pass.